Titre : |
Plugging factor monitor membrane quality acceptance: Bubble point test |
Type de document : |
texte imprimé |
Auteurs : |
Eisenhauer, R. ; Nelson, N. ; Yang, B. |
Mention d'édition : |
United State Department of the Interior - Bureau of Reclamation |
Editeur : |
United State Department of the Interior - Bureau of Reclamation |
Année de publication : |
1991 |
ISBN/ISSN/EAN : |
CI-07124 |
Note générale : |
A bubble, point tester has been researched, developed, specified, constructed, and demonstrated by the demical Engineering Unit at the Denver office of the Bureau of Reclamation. When the yuma desalting plant reaches its designs basis of 72 Mgal/day of product water, $ 109,000/year of plugging factor monitor tape wille be consumed. Because of high membrane consumption and cost, Reclamation requires each manufacturer to send in advance of shipment, 10 each 47-mm, 0.45um membrane desk from each manufacturing run for quality assurance government testing. One of the quality assurance tests run by the government will be the bubble point test. |
Langues : |
Anglais (eng) |
Mots-clés : |
Equipement Expérimentation Chimie |
Index. décimale : |
540 Chimie et sciences connexes |
Résumé : |
A bubble, point tester has been researched, developed, specified, constructed, and demonstrated by the demical Engineering Unit at the Denver office of the Bureau of Reclamation. When the yuma desalting plant reaches its designs basis of 72 Mgal/day of product water, $ 109,000/year of plugging factor monitor tape wille be consumed. Because of high membrane consumption and cost, Reclamation requires each manufacturer to send in advance of shipment, 10 each 47-mm, 0.45um membrane desk from each manufacturing run for quality assurance government testing. One of the quality assurance tests run by the government will be the bubble point test. |
Note de contenu : |
A bubble, point tester has been researched, developed, specified, constructed, and demonstrated by the demical Engineering Unit at the Denver office of the Bureau of Reclamation. When the yuma desalting plant reaches its designs basis of 72 Mgal/day of product water, $ 109,000/year of plugging factor monitor tape wille be consumed. Because of high membrane consumption and cost, Reclamation requires each manufacturer to send in advance of shipment, 10 each 47-mm, 0.45um membrane desk from each manufacturing run for quality assurance government testing. One of the quality assurance tests run by the government will be the bubble point test. |
Plugging factor monitor membrane quality acceptance: Bubble point test [texte imprimé] / Eisenhauer, R. ; Nelson, N. ; Yang, B. . - United State Department of the Interior - Bureau of Reclamation . - United State Department of the Interior - Bureau of Reclamation, 1991. ISSN : CI-07124 A bubble, point tester has been researched, developed, specified, constructed, and demonstrated by the demical Engineering Unit at the Denver office of the Bureau of Reclamation. When the yuma desalting plant reaches its designs basis of 72 Mgal/day of product water, $ 109,000/year of plugging factor monitor tape wille be consumed. Because of high membrane consumption and cost, Reclamation requires each manufacturer to send in advance of shipment, 10 each 47-mm, 0.45um membrane desk from each manufacturing run for quality assurance government testing. One of the quality assurance tests run by the government will be the bubble point test. Langues : Anglais ( eng)
Mots-clés : |
Equipement Expérimentation Chimie |
Index. décimale : |
540 Chimie et sciences connexes |
Résumé : |
A bubble, point tester has been researched, developed, specified, constructed, and demonstrated by the demical Engineering Unit at the Denver office of the Bureau of Reclamation. When the yuma desalting plant reaches its designs basis of 72 Mgal/day of product water, $ 109,000/year of plugging factor monitor tape wille be consumed. Because of high membrane consumption and cost, Reclamation requires each manufacturer to send in advance of shipment, 10 each 47-mm, 0.45um membrane desk from each manufacturing run for quality assurance government testing. One of the quality assurance tests run by the government will be the bubble point test. |
Note de contenu : |
A bubble, point tester has been researched, developed, specified, constructed, and demonstrated by the demical Engineering Unit at the Denver office of the Bureau of Reclamation. When the yuma desalting plant reaches its designs basis of 72 Mgal/day of product water, $ 109,000/year of plugging factor monitor tape wille be consumed. Because of high membrane consumption and cost, Reclamation requires each manufacturer to send in advance of shipment, 10 each 47-mm, 0.45um membrane desk from each manufacturing run for quality assurance government testing. One of the quality assurance tests run by the government will be the bubble point test. |
| ![Plugging factor monitor membrane quality acceptance: Bubble point test vignette](./thumbnail.php?type=1&id=10941) |